admin on December 2nd, 2008

In the series of Fire safety design, below there are the last 3 stages: Choice and siting of alarm devices,  The zoning of the building, and selection of control & indication equipment. The previous stages were: Initial design considerations(stage 1), Siting of manual call points(stage 2), Select automatic detectors(stage 3), Siting automatic detectors(stage 4), and [...]

Share this article:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • email
  • FriendFeed
  • HelloTxt
  • LinkedIn
  • Live
  • PDF
  • Posterous
  • Reddit
  • StumbleUpon
  • Yahoo! Buzz
  • Technorati
  • Twitter

Continue reading about Fire safety and fire design – stages 5, 6 and 7