In the series of Fire safety design, below there are the last 3 stages: Choice and siting of alarm devices, The zoning of the building, and selection of control & indication equipment. The previous stages were: Initial design considerations(stage 1), Siting of manual call points(stage 2), Select automatic detectors(stage 3), Siting automatic detectors(stage 4), and [...]
Continue reading about Fire safety and fire design – stages 5, 6 and 7
In this article we would like to inform you about what does the British standard BS5389 recommends(the system grades and categories, for the new build and materially altered dwellings and for the existing tenanted properties – 2/3 storey or single storey) and what do building regulations demand in New build&materially altered dwellings(in England, Wales, Northern [...]
Continue reading about Standards and regulations for smoke and heat alarms – how do they affect me?
This article is a continuation of the Fire Safety Design stage 1, and continues with Fire Design stage 4. Read more about the second stage(siting of manual call points) and the third stage(select automatic detectors) in Fire Safety Design.
Fire Safety Design stage 2 – Siting of Manual Call Points
All manual call points, whatever the system, [...]
Continue reading about Fire Design, further stages – stage 2 and 3; fire safety